OPEN HOUSE, Saturday, March 21 from 11-1 PM! This house won't last long.
-Roof replaced and gutters added: 2021
-Gas Water Heater installed 2019
-Updated bathrooms, kitchen, dining room, and Florida room. (Quartz and Granite)
New Electrical panel, receptacles, and circuit breakers: 2014
-5-zone irrigation system (New pump 2023)
Active/Transferable Termite Bond
New Privacy Fence: 2023
-HVAC 2008 - Serviced every six months since installation
New Paint in Living Room and Garage: 2025
New Liftmaster with Wifi in Garage:2025
Insulated Garage Door Installed: 2014
Extra Installation Blown in Attic: 2014
Flood Zone X: and never flooded.